FINWIRES · TerminalLIVE
FINWIRES

Market Chatter: Zelenskyy Says Druzhba Oil Pipeline Repairs Completion Expected in Spring

-- Ukrainian President Volodymyr Zelenskyy said the country has made significant progress in restoring the Druzhba oil pipeline, with repairs expected to be completed in spring, Reuters reported Friday, citing remarks released by his office.

Ukraine will complete that as agreed and aim to finish the work by spring, Zelenskyy said, adding that much of the work has already been completed, but repairs to destroyed storage tanks have taken longer, the report said.

Ukraine has been accused by Hungary and Slovakia of trying to delay pipeline repairs, a claim Kyiv has denied.

Both countries have lost access to deliveries of Russian oil through the pipeline since late January, when the pipeline became a target of a Russian drone strike in western Ukraine, the report said. Hungary and Slovakia have had a close political and energy relationship with Russia since the latter's invasion of Ukraine.

Hungary has opposed a 90-billion-euro ($103 billion) European Union loan to Ukraine until pipeline flows are resumed, the report added.

has reached out to Ukraine's Energy Ministry for a comment.

(Market Chatter news is derived from conversations with market professionals globally. This information is believed to be from reliable sources but may include rumor and speculation. Accuracy is not guaranteed.)

Related Articles

Asia

Paladin Energy Reports Higher Fiscal Q3 Uranium Oxide Production; Raises Fiscal Year 2026 Production Guidance

Paladin Energy (ASX:PDN) reported fiscal third-quarter triuranium octoxide production of about 1.3 million pounds from its Langer Heinrich Mine in Namibia, up 5% from the previous quarter, according to a Wednesday filing with the Australian bourse.The company reported uranium oxide production from the mine of 745,484 pounds in the year-ago period, an earlier filing showed.Paladin Energy raised its fiscal year 2026 uranium oxide production guidance range for the mine to 4.5 million to 4.8 million pounds, citing "strong" year-to-date performance. It previously guided for 4 million to 4.4 million pounds, according to an earlier filing.

$ASX:PDN
Asia

Southern Cross Gold Says Drilling at Victoria Prospect Hits Multiple, High-Grade Gold Samples

Southern Cross Gold Consolidated (ASX:SX2) said diamond drilling at the Golden Dyke prospect at the Sunday Creek gold-antimony project in Victoria hit multiple individual samples exceeding 100 grams per tonne (g/t) grade of gold and 10% grade of antimony, according to a Wednesday Australian bourse filing.The best intercept encountered was 1.6 meters at 59.8 g/t grade of gold-equivalent, including 55.3 g/t grade of gold and 1.9% grade of antimony from 313.8 meters.An additional drill rig was added to the project, with 11 rigs now operational.

$ASX:SX2
Asia

PolyNovo Appoints Chief Scientific Officer

PolyNovo (ASX:PNV) appointed Marthe D'Ombrain as chief scientific officer, effective June 1, according to a Wednesday filing with the Australian bourse.D'Ombrain most recently served as executive director and head of global research innovation at CSL (ASX:CSL), the filing added.

$ASX:CSL$ASX:PNV